or upgrade process (either when cancelling the wizard itself or when exiting
the application). Rephrased confirmation message for clarity.
Signed-off-by: Konstantina Chremmou <konstantina.chremmou@citrix.com>
(either when cancelling the wizard itself or exiting the application).
Implemented in the first instance for compiling the server status report.
Signed-off-by: Konstantina Chremmou <konstantina.chremmou@citrix.com>
* Simplification: use auto-properties.
* Removed unnecessary null check. Converted private methods to linq method chain.
* Removed unused file. Added null check.
* Corrected property names as it was difficult to distinguish between the alert,
the patch and the filepath.
* Removed duplicate lock.
* CA-296490: Rewrote the logic uploading single updates so as to facilitate uploading to multiple pools in parallel.
* Corrections as per code review.
* Account for the case of uploading from disk legacy updates that do not correspond to an update alert.
Removed unfriendly error messages (the failure is written out in the logs anyway).
* Wizard test corrections and some modernising:
- Only call cancel on the last page if the test allows us to.
- Do finish the UpdatesWizard test.
- Finish the RunWizardKeyboardTests using key strokes instead of button clicks.
- Ensure the Cancel/Previous buttons do not have focus when sending an Enter stroke.
- Use optional parameters in the WizardTest constructor and string interpolation.
* Renamed badly named property.
* Improved code cloning VMs by assigning new opaque_refs to cloned VBDs.
Compacted test object provider: use optional parameters instead of method overloads.
* Modifications to prevent multiple update of enabled state and ensure the wizard
buttons are updated last.
Signed-off-by: Konstantina Chremmou <konstantina.chremmou@citrix.com>
If the update sequence for automated updates contains an update which requires a host reboot and a hotfix with an immediate toolstack restart (after-apply-guidance=restartXAPI and guidance-mandatory=true),
then XenCenter should do an immediate host reboot after applying the hotfix that required the immediate toolstack restart (as doing a toolstack restart when a host reboot is required is potentially risky)
Signed-off-by: Mihaela Stoica <mihaela.stoica@citrix.com>
* CP-29768: Add Skip functionality for RPU supp pack installation
Signed-off-by: Ji Jiang <ji.jiang@citrix.com>
* Minor corrections
Signed-off-by: Mihaela Stoica <mihaela.stoica@citrix.com>
* Revert unnecessary layout changes
Also changed the title of the confirmation dialog to the wizard title, as it could be shown in either RPU or the Patching wizard
Signed-off-by: Mihaela Stoica <mihaela.stoica@citrix.com>
With this change, following are working:
1) After applying XS75E003-5 only restart host, no restart toolstack
2) After applying vGPU driver on 7.4, restart host happens
Signed-off-by: Ji Jiang <ji.jiang@citrix.com>
* CA-293813: Patch pools in parallel when installing a single update/patch or supplemental package.
Signed-off-by: Konstantina Chremmou <konstantina.chremmou@citrix.com>
* Corrections as per code review.
Signed-off-by: Konstantina Chremmou <konstantina.chremmou@citrix.com>
reverted to the new class UpdateUpgradeWizard which serves as base for the
Patching and the RPU wizards. Pass the list of resolved problems to the
automated updates page and not the actions, so as to prevent premature (i.e.
on creation as opposed to on start) addition to the global list shown on
the Events page.
Signed-off-by: Konstantina Chremmou <konstantina.chremmou@citrix.com>
is now in one place, namely the PatchingWizard_PrecheckPage.UnwindChangesActions.
The pages following this page use now this list instead of the problems
encountered, so we ensure that the update/upgrade plans do not include the
unwind action if no resolution of problems took place on the prechecks page.
Signed-off-by: Konstantina Chremmou <konstantina.chremmou@citrix.com>
* Deprecate set but unused Status property in favour of ProgressDescription.
* Deprecate set but unused TitlePlan property.
* Deprecated property Title in favour of ProgressDescription.
* Removed unused plan RebootHostPlanAction.
* Updated event declaration.
* Removed property Visible. The plan is to have the actions log their history as soon as some is available.
* Reworked the logging for the plan actions. The main change is the replacement of
the ProgressDescription with a stack where all the steps of an action are stored,
i.e. the action is responsible for its history, not the worker running it.
* Lock the progress history before accessing it.
* Better handling of error logging and user cancellation.
Signed-off-by: Konstantina Chremmou <konstantina.chremmou@citrix.com>
- In the RPU case, re-enable the host after the upgrade is done, as the host will be put back into maintenance mode when needed during the update process.
- The VMs should not be repatriated during the RPU
- When a host is rebooted, it needs to be disabled first (even if an evacuation is not needed), otherwise the reboot won't happen
Signed-off-by: Mihaela Stoica <mihaela.stoica@citrix.com>
Renamed HostPlanActions class to HostPlan to avoid confusion with the HostPlanAction class.
Signed-off-by: Konstantina Chremmou <konstantina.chremmou@citrix.com>
- Also corrected the function that creates the update plan action in RPU: when running a retry, these actions shouldn't be regenerated.
Signed-off-by: Mihaela Stoica <mihaela.stoica@citrix.com>
- Some methods have been moved/added to the base class to facilitate the calculation of the plan actions in the RPU case.
- Also fixed the calculation of the progress bar value.
Signed-off-by: Mihaela Stoica <mihaela.stoica@citrix.com>
The base class contains all the code for creating and starting the background workers, displaying the progress of the actions, handling failures and retries.
The derived classes override the property for label at the top of the page and the method that generates the plan actions.
Signed-off-by: Mihaela Stoica <mihaela.stoica@citrix.com>